Workers of Apastovsky and Mamadyshsky branches of JSC “Tatavtodor” are liquidating the wheel tracking on the asphalt-concrete layer of the driveway of the federal auto roads “Kazan-Buinsk-Uliyanovsk” and M-7 “Volga” that lead from Moscow through Vladimir, Nizhniy Novgorod and Kazan to Ufa.

04/25/2012

Apastovsky Branch

Apastovsky branch of JSC “Tatavtodor” started the partial (full-width) repair of worn layers of asphalt-concrete on the auto road “Ulanovo-Karatun” on kilometers 37+150 – 37+800.

04/17/2012

Suburban Branch

On the regional public auto roads of the Republic of Tatarstan the horizontal road marking is being striped.For higher safety of the road movement on the auto road “Kazan-Shemordan” in Staroye Shigaleevo location, pedestrian crossings were furnished with double reflective elements by workers of the Suburban branch.

04/10/2012

Mamadyshsky Branch

Pothole repair of the asphalt coat on the federal auto road M-7 “Volga” was started by workers of Mamadyshsky branch. For this type of repair, hot asphalt-concrete mix is used, and pothole repair machinery such as German combined road-making machine with thermos bunker, mini roller and CASE loader-based road scraper.

03/27/2012

Аrsky Branch

The workers of Arsk and Vysokogorsky branches are patching the coating of “Kazan-Malmyzh” auto road with cold-laid asphalt concrete.

03/19/2012

Apastovsky Branch

The snow is being removed from bridges and metal barrier railings. Snow is cleared from the sides and edges of the road bed of the auto roads. Inlets and outlets of the pipe culverts are cleared so as to prepare them for spring floods.

03/12/2012

Suburban Branch

In Rybno-Slobodsky RBRU the snow shafts are being removed from the sides and edges of the road bed on the auto road “M-7 “Volga”- Shumkovo- R. Sloboda”.

03/01/2012

Mamadyshsky Branch

With our machinery we clear the snow behind the metal barriers on the roadsides and off the double-sided axial embankment on the auto road M-7 “Volga”.

02/28/2012

Аrsky Branch

In Arsk branch the exploitation of rotary-milling snow blower attachment OVERASEN UTV-180 began. The snow removal capacity of the attachment is 1500 tons per hour.

01/13/2012

Mamadyshsky Branch

Federal highway М-7 “Volga”. Mamadyshsky Branch performs cleaning of snow at the waysides, near protective guards and around road signs.

01/10/2012

Suburban Branch

Suburban Branch performs hard work of cleaning the protective guards of snow and dirt. At the roads with heavy traffic they work even at night where there is artificial lighting.

01/10/2012

Apastovsky Branch

12/12/2011

Apastovsky Branch

The personnel of Apastovsky Branch vigorously fight snow drifts and icing-over. They clean both the roadway and waysides of motor roads, remove the snow from road coating and pedestrian passes at the bridges. To prevent the appearance of snow drifts across the roads from the lower snowstorms snow fences are being erected.

12/01/2011

Mamadyshsky Branch

Fighting the consequences of heavy snowfalls on November 28 – 29, workers of Mamadyshsky Branch clean away snow banks near protective guards, waysides and central safeguard at the highway М-7 “Volga”.