In 2020 JSC “Tatavtodor” had successfully finished construction, reconstruction and repair of 173 sites on public auto roads of the Republic of Tatarstan. Total cost of works is 7.7 billion rubles; total length of constructed and reconstructed roads for the reporting period is 269 km, of which 45.5 km are municipal auto roads, including roads reconstructed as part of the following programs:

Works for implementation of Municipal program for road works on public local auto roads for year 2020 in the Republic of Tatarstan.

Total cost of works is 106.5 million rubles, total road length is 11.4 km, works conducted in 9 municipal districts of the Republic of Tatarstan;

              

 

Reconstruction of asphalted road network in the centers of municipal districts and cities of the Republic of Tatarstan.

Total cost of works is 186.4 million rubles, total road length is 15.4 km, works conducted in 9 municipal districts of the Republic of Tatarstan;

                                 

Normalization of road network in the inhabited localities of the Republic of Tatarstan (transitional type of road surface).

Total cost of works is 128.2 million rubles, total road length is 14.7 km, works conducted in 5 municipal districts of the Republic of Tatarstan;

   

For the reporting period, access roads with solid surfacing were constructed in 8 inhabited localities of our republic with total population of 1627 thousand people. Works were conducted at 7 construction sites with total length of 23 km in 5 municipal districts of the Republic of Tatarstan. In 2020, JSC “Tatavtodor” also continued its active work as a participant of the federal program “Sustainable development of rural territories for 2014-2018 and for the period until 2020” (see list of works fulfilled as a part of the program below):

District

Site

Locality

Length, km

Aktanyshsky

Reconstruction of Novoye Alimovo – Staroye Alimovo auto road in Aktanyshsky municipal district of the Republic of Tatarstan

Staroye Alimovo village

5.869

Reconstruction of Chinnikovo – Chatovo auto road in Aktanyshsky municipal district of the Republic of Tatarstan

Chatovo settlement

2.380

Reconstruction of M-7 "Volga" – Usy auto road in Aktanyshsky municipal district of the Republic of Tatarstan

Usy settlement

4.928

Arsky

Reconstruction of "Arsk - Siza"- Staraya Masra auto road in Arsky municipal district of the Republic of Tatarstan

Staraya Masra village

1.987

Kamko-Ustyinsky

Reconstruction of "Kazan – Ulyanovsk" – Staroye Baryshevo - Kamskoye Ustye" – Klyancheyevo auto road in Kamsko-Ustyinsky municipal district of the Republic of Tatarstan

Klyancheyevo settlement, Chelny village

4.386

Kukmorsky

Reconstruction of Verkhniy Kukmor – Studeny Kliuch auto road in Kukmorsky municipal district of the Republic of Tatarstan

Studeny Kliuch village

1.735

Tetiushsky

Construction of "Buinsk – Tetiushi" –Zelenovka auto road in Tetiushsky municipal district of the Republic of Tatarstan

Zelenovka settlement

1.463

In 2020 JSC “Tatavtodor” took part in the program for overall development of urban transportation infrastructure as a part of a national project “Safe and quality auto roads”. The works were conducted on 27 construction sites with total length of 39.3 km, in 10 municipal districts of the republic; total cost of works amounted to 2.3 billion rubles. Construction works fulfilled in Nizhnekamsk city of the Republic of Tatarstan, including those paid by budget of the Republic:

 

- Overhaul reconstruction of Shinnikov avenue from Baki Urmanche street to Mendeleyev street with total cost of works of 353.6 million roubles, total length 3.8 km, total surface 43120 m2, pedestrian area 11607 m2, bike lanes surface 6464 m2. Eight bus stops were installed, two of which are closed type equipped with air conditioners, cameras, heaters and USB chargers for mobile phones.